Client
Manchester Pacific Gateway / IQHQ RaDD
Work Performed
Hazardous Materials Abatement
Building Demolition
Salvaging & Recycling
Mass Excavation
Manchester Pacific Gateway / IQHQ RaDD
- Originally, built in 1942 for WWII storage and loading dock
- 60,000 SF Footprint and 126 ft. tall
- 40,000+ CY of concrete
- 100% recycled and re-used materials
- 8” to 12” thick concrete slabs and decks
- 18” to 48”. thick concrete walls
- Zero injuries reported during the project
- Completed ahead of schedule and on budget
- 5,000 lbs. to 165,000 lbs. equipment used to demolish the building
- Top-down demolition method used