International Legacy Center
Mission Valley
December 2017 - February 2018
> 12 acre site
> Over fifteen 2-story structures
> 130,000 SF of asphalt pavement
> 3,500 CY concrete and asphalt material crushed & re-used onsite
> Multiple 65' palm trees & vegetation
> Over 10 large size excavators, skid-steers & mini-excavators
> Finished ahead of schedule
Play
Manchester Pacific Gateway
Manchester
April 2017 - January 2018
> Built in 1942 for WWII storage and loading dock
> Floor-by-floor demolition method used
> 17,500+ man-hours
> 60,000 SF Footprint and 126 ft. tall
> 40,000+ CY of concrete
> 8” to 12” thick concrete slabs and decks
> 18” to 48”. thick concrete walls
Play
Merryfield Project
Spectrum
June 2016 - November 2016
> Two 84,000 SF buildings demolished & disposed in three weeks
> 6 day work weeks to finish ahead of schedule
Play
Downtown San Diego
520 W Ash St
June 2016 - December 2016
> Building demolition, Asbestos abatement & Mass excavation
> Abated & demolished 42' high steel building & 15' high concrete structure
> Over 100 truck loads in and out of site per day
> Multiple excavators used ranging from 80,0000 to 110,000 lbs
> Specialty long-stick excavators used to reach depths of 65' below grade
> 40,000 CY Exported