Manchester Pacific Gateway
Manchester
April 2017 - January 2018
> Built in 1942 for WWII storage and loading dock
> Top-down demolition method used
> 17,500+ man-hours
> 60,000 SF Footprint and 126 ft. tall
> 40,000+ CY of concrete
> 8” to 12” thick concrete slabs and decks
> 18” to 48”. thick concrete walls
> Foundation: 150 pile caps – 17’ x 17’ wide and 5’ thick – connected by 1.5’ thick, 5’ tall stem walls
> 5,000 lbs. to 165,000 lbs. use of demo equipment
> Zero injuries reported during the project
> Completed ahead of schedule and on budget
Play
Slider